挤塑板在施工过程中如何处理基层墙体?
作者:admin 来源:本站 发布时间:2019-12-26 16:47:21 浏览次数:11
  挤塑板在外墙保温工程中起着非常重要的作用,其安装方式也有很多,下面济南挤塑板厂家为大家讲解一下,挤塑板在施工过程中如何处理基层墙体。
Extrusion board plays a very important role in the external wall insulation project, and there are many installation methods. Now Jinan Extrusion board manufacturer will explain how to deal with the basic wall during the construction process.
山东地区有三种主要的挤塑板安装方式:湿粘固法、无龙挂挂法和龙挂挂挂法。基础墙施工中处理方法如下:
There are three main installation methods of extruded board in Shandong: wet bonding method, non dragon hanging method and dragon hanging method. The treatment methods in the construction of foundation wall are as follows:
(1)一次墙体检查及处理。彻底清除影响墙体结构的材料,如浮灰、油污、空鼓、松动、延迟等。墙面应垂直、平整。阴阳线的角度是正方形和直线。要用弹性腻子修补有裂缝的基层,对不平整的墙面进行两次平整处理。
(1) One time wall inspection and treatment. Thoroughly remove the materials that affect the wall structure, such as floating ash, oil, hollowing, loosening, delay, etc. The wall should be vertical and flat. The angle of the yin-yang line is square and straight. Elastic putty shall be used to repair the cracked base course, and the uneven wall surface shall be leveled twice.
(2)垂直吊挂及吊带控制线。对于多层建筑,可以使用大型电线从顶层垂直下降。复测线与水平线的垂直度可根据地面标高或施工面+500ram线作为水平基准线进行控制。要根据设计对墙面进行隔断,窗户外围的隔墙线尽量调整与窗户窗边水平。

(2) Vertical hanging and sling control line. For multi story buildings, large wires can be used to drop vertically from the top floor. The perpendicularity of the resurvey line and the horizontal line can be controlled according to the ground elevation or the + 500ram line of the construction surface as the horizontal datum line. Partition the wall according to the design, and try to adjust the partition line around the window to the level of the window edge.

(3)胶粘剂的制备与施工。料浆(专用砂浆)按重量比4:1(干粉:乳液)配制。搅拌均匀后静置3rain,充分利用浆液。泥浆应在3h内用完。
(3) Preparation and construction of adhesive. Slurry (special mortar) is formulated by weight ratio 4:1 (dry powder: emulsion). After mixing evenly, stand for 3Rain to make full use of the slurry. Mud should be used up within 3 hours.
(4)粘贴保温装饰一体化板。用不锈钢泥刀将胶均匀地涂抹在一体化板的背面。再用牙泥刀将45边磨平。角拉成条,白色底并沿水平方向向上粘贴到墙面上,板面应平整。
(4) Paste the integrated board of thermal insulation and decoration. Apply the glue evenly on the back of the integrated board with a stainless steel trowel. Use a dental spatula to smooth out the 45 sides. The corners shall be drawn into strips, white bottom shall be pasted on the wall along the horizontal direction, and the board surface shall be flat.
以上是济南挤塑板厂家您介绍的在施工过程中对挤板基层墙体的处理,您可以参考施工情况,提醒您,找一个专门的安装师傅比较可靠。希望以上内容对您有所帮助。
The above is the treatment for the basic wall of extruded slab introduced by Jinan extruded slab manufacturer in the construction process. You can refer to the construction situation and remind you that it is more reliable to find a special installation master. I hope the above will help you.